Capital Project Tracking and Reporting SystemCity of St. Joseph, Missouri
New Fire Station (Station 9)
 

Project Information

New Fire Station (Station 9)
313-200

Project Manager: David Simpson

Assistant Project Manager: Mike  Dalsing

Current Project Status: Construction

Project Scope:
   To Build 2 New Fire Stations: Use Station 12 savings and Geiger Mansion proceeds to acquire land for three stations. This station will be called #9 The address of this station will be 3202 Faraon Street. 

Project Funding:
   CIP Sales Tax

Project Funding Amount: $3,410,621.61

Update:
   The contract for construction was awarded to E.L. Crawford Construction Company, and work is underway at the site. The site has been graded to subgrade level. Footings are installed, under-slab plumbing and electrical work has been completed. The concrete floors of the station are complete. A good portion of the concrete block walls have been installed, some steel posts are in place and exterior metal studs are in place. Multiple trenching is be done to install utilities and the fire hydrant and oil/water separator have been installed at the front of the building. The remaining concrete for the sidewalk along Jules Street has been poured along with concrete the ADA ramp at 32nd and Jules. Fire Station 9 is ~36% complete with final completion set for July 14, 2018. 

Last Update: Friday November 3, 2017